This website uses cookies ...but have cookies ;-)


For an optimal website experience, we use cookies and similar technologies to show personalized content, offer functions and collect statistics. Clicking on "Allow cookies" entitles us to this data processing in accordance with our data protection declaration . Cookies can also be adjusted at any time after selection (after clicking on the item at the top right) in the settings.

Essential cookies enable basic functions and are necessary for the website to function properly.
Statistics cookies collect information anonymously. This information helps us to understand how our visitors use our website.
Marketing cookies are used by third parties or publishers to display personalized advertisements. They do this by tracking visitors across websites.

Hook- Up

The term "hook- up" was coined in the early 1980s- during the peak development phase of microelectronics.

Hook- up means something like "the integration of manufacturing equipment into the manufacturing processes and the installation of the necessary infrastructure systems and equipment".

Or put another way:

"hooking up the equipment and installing it."

The services we offer as part of equipment hook- up are diverse and cover all installation areas:

Starting with move- in, electrical engineering, ultra- clean media and ultra-clean gases, air and filter technology, refrigeration technology, sanitary installation, exhaust air treatment and measurement technology, through to steel construction and cleanroom interior fittings.

Cleanroom Installation During Operation

The particular challenge here:

All these services have to be carried out while the cleanroom is fully operational and production continues.

Appropriate industry know- how, expertise and discipline are basic requirements for installation work during ongoing operations.

In one room, on the left side, a thick pipe goes to the back, then up and back again, and then down and back and up.
In one room there is a shaft on the ceiling. Next to it are wires and pipes.

Cleanroom Construction, Ventilation Technology, Cleanroom Concepts

With our decades of experience in hook- up and our pioneering role in the development of cleanroom technology has made us a recognized partner of the electronics and semiconductor industries. Our service portfolio in hook- up is correspondingly broad:

  • Planning and execution of the supply and exhaust air technology, the plastic, process exhaust air as well as exhaust air cleaning systems
  • Clean room construction with the components RR ceilings, walls and floors as well as filter systems
  • Comprehensive measurement technology with RR qualification and microbiological qualification of ventilation systems as well as partitioning technology
  • Apparatus engineering and component production for e.g. protective systems, cladding, structural elements and much more.
In einer großen Halle, bei der die Wände und Decken aus einzelnen Platten bestehen stehen nebeneinander zwei raumhohe Gerüste hinter einem Absperrband. Darüber fehlen vier Platten in der Decke. Schräg links fehlen ebenfalls vier Platten.

Do you have questions or are you planning a specific project? We are looking forward to your inquiry.

Contact us directly and let us advise you!